Real Aviation Video

Split Airport SPU/LDSP Runway Resurfacing Work – Winter 2020


Split Airport SPU/LDSP Runway Resurfacing Work – Winter 2020During the past two weeks, Split Airport’s runway underwent partial resurfacing for the Summer 2020 season. 16 meters of the runway were resurfaces, while the complete runway resurfacing and upgrades should start after the summer season this year.

INSTAGRAM: https://www.instagram.com/edostuffhr/
PATREON: https://www.patreon.com/edostuff
FACEBOOK: https://www.facebook.com/pages/EdoStu…
TWITTER: https://twitter.com/EdoStuffHR
FLICKR: https://www.flickr.com/photos/1307240…
CAMERA: Sony DSC-HX350 (Hand-held)

Thanks for watching, hope you enjoyed 🙂

Leave a Reply